CNCMC TE250 25 Ton Crawler Excavator

Introduction:

  • Powerful digging force and high efficiency for heavy-duty construction tasks.
  • Stable and reinforced structure ensures long service life and reliability.
  • Excellent performance in earthmoving, mining, and large-scale projects.
  • Energy-saving design with low fuel consumption and operating cost.
  • Wide adaptability to various working conditions and multiple attachments.


Product Detail

Product Tags

Specifications TE250 A Overall length 9840mm
Operating weight 25000kg B Overall width 3180mm
Standard bucket capacity 1.2m³ C Overall height of boom 3180mm
Engine   D With of platform 2700mm
Model CUMMINS 6BTAA5.9-C178 E Overall height of cab 2996mm
Type Turbo-charged with inter-cooled F Ground clearance of counterweight 1062mm
Power 133KW/2000rpm H Min.ground clearance 2375mm
Max.torque 708N.m at 1500rpm G Height of engine cover 480mm
No.of cylinders 6 I Length of platform 2870mm
Displacement 5883CC I’Rear swing radius 2940mm
Hydraulic system    J Track wheelbase distance 3830mm
Main pump:   K Chassis length 4640mm
Type Variable displacement axial piston pumps L Chassis width 3180mm
Max.displacement 2x112cc/rev (C TYPE)2x115cc/rev M Track gauge 2580mm
Working pressure 31.4/34.3Mpa (CTYPE)32.3/34.3Mpa N standard width of track shoe 600mm
Hydraulic motor   Max.digging reach 10258mm
Swing axial piston motor Max.digging depth 6995mm
Travel axial piston motor Max.vertical wall digging depth 6090mm
Performance   Max.digging height 9612mm
Swing speed 11.3rpm (C TYPE)10.5rpm Max.dumping height 6690mm
Max.travel speed H/L 5.7/3.2km/h (CTYPE)5.8/3.2km/h Min.swing radius 3740mm
Gradeability 35°    
Max.digging force of bucket 162kN    
Max.digging force of arm 123kN    
Ground pressure 44kpa    
Tank capacity      
Fuel tank capcity 390L    
Hydraulic tank capacity 210L    


  • Previous:
  • Next:

  • Write your message here and send it to us